Revised Code of Washington Chapter 78.56 — Metals Mining and Milling Operations

Washington · statute · Wash. Rev. Code ch. 78.56 · 18 active provisions

18 active provisions.

Wash. Rev. Code § 78.56.040

Disclosures required with state environmental policy act checklist—Public inspection of information

The department of ecology shall require each applicant submitting a checklist pursuant to chapter 43.21C RCW for a metals mining and milling operation to disclose the ownership and each controlling interest in the proposed operation. The applicant shall also disclose all other mining operations within the United States…

WashingtonMetals Mining and Milling Operationseffective
Wash. Rev. Code § 78.56.050

Environmental impact statement required—Mitigation measures to be part of permit requirements—Department of ecology to cooperate with affected local governments

(1) An environmental impact statement must be prepared for any proposed metals mining and milling operation. The department of ecology shall be the lead agency in coordinating the environmental review process under chapter 43.21C RCW and in preparing the environmental impact statement, except for uranium and thorium op…

WashingtonMetals Mining and Milling Operationseffective
Wash. Rev. Code § 78.56.070

Quarterly inspections by responsible state agencies required—Cross-training and coordination of inspections encouraged

(1) State agencies with the responsibility for inspecting metals mining and milling operations regulated under this chapter shall conduct such inspections at least quarterly: PROVIDED, That the inspections are not prevented by inclement weather conditions.(2) The legislature encourages state agencies with inspection re…

WashingtonMetals Mining and Milling Operationseffective
Wash. Rev. Code § 78.56.080

Estimate of costs by department of ecology and department of natural resources—Fee on operations to be established by department of ecology

(1)(a) As part of its normal budget development process and in consultation with the metals mining industry, the department of ecology shall estimate the costs required for the department to meet its obligations for the additional inspections of metals mining and milling operations required by chapter 232, Laws of 1994…

WashingtonMetals Mining and Milling Operationseffective
Wash. Rev. Code § 78.56.090

Initial waste discharge permits for tailings facilities—Siting criteria—Primary screening process—Technical site investigation—Site selection report

(1) In the processing of an application for an initial waste discharge permit for a tailings facility pursuant to the requirements of chapter 90.48 RCW, the department of ecology shall consider site-specific criteria in determining a preferred location of tailings facilities of metals mining and milling operations and…

WashingtonMetals Mining and Milling Operationseffective
Wash. Rev. Code § 78.56.100

Waste discharge permits for metals mining and milling operations tailing facilities—Pollution control standards—Waste rock management plan—Citizen observation and verification of water samples—Voluntary reduction plan—Application of this section

(1) In order to receive a waste discharge permit from the department of ecology pursuant to the requirements of chapter 90.48 RCW or in order to operate a metals mining and milling tailing facility, an applicant proposing a metals mining and milling operation regulated under this chapter must meet the following additio…

WashingtonMetals Mining and Milling Operationseffective
Wash. Rev. Code § 78.56.110

Performance security required—Conditions—Department of ecology authority to adopt requirements—Liability under performance security

(1) The department of ecology shall not issue necessary permits to an applicant for a metals mining and milling operation until the applicant has deposited with the department of ecology a performance security which is acceptable to the department of ecology based on the requirements of subsection (2) of this section.…

WashingtonMetals Mining and Milling Operationseffective
Wash. Rev. Code § 78.56.120

Remediation or mitigation by department of ecology—Order to submit performance security

The department of ecology may, with staff, equipment, and material under its control, or by contract with others, remediate or mitigate any impact of a metals mining and milling operation when it finds that the operator or permit holder has failed to comply with relevant statutes, rules, or permits, and the operator or…

WashingtonMetals Mining and Milling Operationseffective
Wash. Rev. Code § 78.56.130

Legislative finding—Impact analysis required for large-scale operations—Impact fees by county legislative authority—Application of this section—Application of chapter 82.02 RCW

(1) The legislature finds that the construction and operation of large-scale metals mining and milling facilities may create new job opportunities and enhance local tax revenues. However, the legislature also finds that such operations may also result in new demands on public facilities owned and operated by local gove…

WashingtonMetals Mining and Milling Operationseffective
Wash. Rev. Code § 78.56.150

Application of requirements to milling facilities not adjacent to mining operation

A milling facility which is not adjacent to or in the vicinity of the metals mining operation producing the ore to be milled and which processes precious or base metal ore by treatment or concentration is subject to the provisions of RCW 78.56.010 through 78.56.090, 78.56.100(1) (a), (c), and (d), 78.56.110 through 78.…

WashingtonMetals Mining and Milling Operationseffective
Wash. Rev. Code § 78.56.160

Moratorium on use of heap leach extraction process—Joint review by department of ecology and department of natural resources—Permanent prohibition of in situ extraction

(1) Until June 30, 1996, there shall be a moratorium on metals mining and milling operations using the heap leach extraction process. The department of natural resources and the department of ecology shall jointly review the existing laws and regulations pertaining to the heap leach extraction process for their adequac…

WashingtonMetals Mining and Milling Operationseffective