yourstate.us

Revised Code of Washington Chapter 78.60 — Geothermal Resources

Washington · statute · Wash. Rev. Code ch. 78.60 · 30 active provisions

30 active provisions.

Wash. Rev. Code § 78.60.100

Plugging and abandonment of wells or core holes—Transfer of jurisdiction to department of ecology

Any well or core hole drilled under authority of this chapter from which:(1) It is not technologically practical to derive the energy to produce electricity commercially, or the owner or operator has no intention of deriving energy to produce electricity commercially, and(2) Usable minerals cannot be derived, or the ow…

WashingtonGeothermal Resourceseffective
Wash. Rev. Code § 78.60.210

Filing of logs and surveys with department upon completion, plugging, abandonment, or suspension of operations

Upon completion or plugging and abandonment of any well or core hole or upon the suspension of operations conducted with respect to any well or core hole for a period of at least six months, one paper and one electronic copy of logs, including but not restricted to heat flow, temperature gradients, and rock conductivit…

WashingtonGeothermal Resourceseffective
Wash. Rev. Code § 78.60.250

Violations—Modification of permit, when necessary—Departmental order—Issuance—Appeal

Whenever it appears with probable cause to the department that:(1) A violation of any provision of this chapter, regulation adopted pursuant thereto, or condition of a permit issued pursuant to this chapter has occurred or is about to occur, or(2) That a modification of a permit is deemed necessary to carry out the pur…

WashingtonGeothermal Resourceseffective