§ 886.330 Work write-ups and cost estimates.

United States · 24 CFR — Housing and Urban Development · Status: effective

Get this as JSONEmbed this
Cite this
Citation
24 CFR 886.330, § 886.330 Work write-ups and cost estimates, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/101423
Permanent ID
ys:prov:101423@1
SHA-256
f7a945daf3d75cfa69e541ba09d93715606b21e313df1b1c4ed161e0ddf3288d

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) HUD preparation of work write-ups. If needed, a work write-up, including plans and specifications, will be made by HUD specifying necessary rehabilitation. (b) HUD specifies deficiencies and corrective action. The work write-up will specify deficiencies noted by HUD and describe the manner in which the deficiencies are to be corrected, including minimum acceptable levels of workmanship and materials. (c) HUD preparation of cost estimates. HUD shall perform or cause to be performed a cost estimate to complete rehabilitation. The cost of any necessary relocation, as determined by HUD as being necessary to expedite the rehabilitation and the estimated cost to the owner of maintaining project rents at the Section 8 level, as required by HUD prior to execution of the Contract, plus other costs allowable by HUD will be included in the cost estimate. The work write-up and cost estimate shall become part of the disposition package and will be used in determining the sales price of the project.