24 CFR 965.304
§ 965.304 Order of funding.
United States · 24 CFR — Housing and Urban Development · Status: effective
Cite this
- Citation
- 24 CFR 965.304, § 965.304 Order of funding, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/101956
- Permanent ID
ys:prov:101956@1- SHA-256
18a648e7997c2487ed6a3149888d5b83fe79a5d5d2ca555cf837dc219017a855
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
Within the funds available to a PHA, energy conservation measures should be accomplished with the shortest pay-back periods funded first. A PHA may make adjustments to this funding order because of insufficient funds to accomplish high-cost energy conservation measures (ECM) or where an ECM with a longer pay-back period can be more efficiently installed in conjunction with other planned modernization. A PHA may not install individual utility meters that measure the energy or fuel used for space heating in dwelling units that need substantial weatherization, when installation of meters would result in economic hardship for residents. In these cases, the ECMs related to weatherization shall be accomplished before the installation of individual utility meters.