§ 3282.408 Plan of notification required.

United States · 24 CFR — Housing and Urban Development · Status: effective

Get this as JSONEmbed this
Cite this
Citation
24 CFR 3282.408, § 3282.408 Plan of notification required, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/103116
Permanent ID
ys:prov:103116@1
SHA-256
17a79aac8ba5e81cf89c9af991bfd8469c6929edc6cf26aeea8b666faa2959e3

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) Manufacturer's plan required. Except as provided in § 3282.407, if a manufacturer determines that it is responsible for providing notification under § 3282.405, the manufacturer must prepare a plan in accordance with this section and § 3282.409. The manufacturer must, as soon as practical, but not later than 20 days after making the determination of defect, serious defect, or imminent safety hazard, submit the plan for approval to one of the following, as appropriate: (1) The SAA of the State of manufacture, when all of the manufactured homes covered by the plan were manufactured in that State; or (2) The Secretary, when the manufactured homes were manufactured in more than one State or there is no SAA in the State of manufacture. (b) Implementation of plan. Upon approval of the plan, including any changes for cause required by the Secretary or SAA after consultation with the manufacturer, the manufacturer must carry out the approved plan within the agreed time limits.