29 CFR 1919.28
§ 1919.28 Unit proof tests—cranes and gear accessory thereto.
United States · 29 CFR — Labor · Status: effective
Cite this
- Citation
- 29 CFR 1919.28, § 1919.28 Unit proof tests—cranes and gear accessory thereto, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/129059
- Permanent ID
ys:prov:129059@1- SHA-256
a9f315382a9e6c5e0e144d31b46b2e181518b5014b1a30963682234d462d10fb
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) Except as noted in paragraph (e) of this section, cranes and other hoisting machines, together with gear accessory thereto, shall be tested with a proof load which shall exceed the safe working load as follows:
(b) The proof load shall be lifted and swung as far as possible in both directions. If the jib or boom of the crane has a variable radius, it shall be tested with proof loads, as specified in paragraph (a) of this section, at the maximum and minimum radii. In the case of hydraulic cranes, when due to the limitation of pressure it is impossible to lift a load 25 percent in excess of the safe working load, it will be sufficient to lift the greatest possible load.
(c) Initial proof tests of new cranes shall be made only with a dead load as specified in paragraph (b) of this section.
(d) Initial tests of cranes which have been in service, quadrennial tests, or tests associated with replacements or renewals, may be made with spring or hydraulic balances where dead loads are not reasonably available under the following conditions:
(1) Tests shall be conducted at maximum, minimum, and intermediate radius points, as well as such points in the arc of rotation as meet with the approval of the accredited person.
(2) An additional test shall be conducted with partial load and shall include all functions and movements contemplated in the use of the crane.
(e) In cases where shore-type cranes are mounted permanently aboard barges, the requirements of this Subpart E with respect to unit proof tests and examinations shall not apply and the applicable requirements of Subpart H of this part shall be adhered to with respect to unit proof tests and examinations.