29 CFR 1926.1405

§ 1926.1405 Disassembly—additional requirements for dismantling of booms and jibs (applies to both the use of manufacturer procedures and employer procedures).

United States · 29 CFR — Labor · Status: effective

Get this as JSONEmbed this
Cite this
Citation
29 CFR 1926.1405, § 1926.1405 Disassembly—additional requirements for dismantling of booms and jibs (applies to both the use of manufacturer procedures and employer procedures), United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/129463
Permanent ID
ys:prov:129463@1
SHA-256
ccc4185ccef5ad292eb6e60e51c5e5e90b7d4dae8c13aa7e44ce01a6ee3f5933

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

Dismantling (including dismantling for changing the length of) booms and jibs. (a) None of the pins in the pendants are to be removed (partly or completely) when the pendants are in tension. (b) None of the pins (top or bottom) on boom sections located between the pendant attachment points and the crane/derrick body are to be removed (partly or completely) when the pendants are in tension. (c) None of the pins (top or bottom) on boom sections located between the uppermost boom section and the crane/derrick body are to be removed (partly or completely) when the boom is being supported by the uppermost boom section resting on the ground (or other support). (d) None of the top pins on boom sections located on the cantilevered portion of the boom being removed (the portion being removed ahead of the pendant attachment points) are to be removed (partly or completely) until the cantilevered section to be removed is fully supported.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.