30 CFR 57.6401
§ 57.6401 Shunting.
United States · 30 CFR — Mineral Resources · Status: effective
Cite this
- Citation
- 30 CFR 57.6401, § 57.6401 Shunting, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/132803
- Permanent ID
ys:prov:132803@1- SHA-256
8f93f4ff8115956ad5b66a63f80b0cd34abc529ae15871744b717a001084e101
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
Except during testing—
(a) Electric detonators shall be kept shunted until connected to the blasting line or wired into a blasting round;
(b) Wired rounds shall be kept shunted until connected to the blasting line; and
(c) Blasting lines shall be kept shunted until immediately before blasting.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.