30 CFR 57.6407

§ 57.6407 Circuit testing.

United States · 30 CFR — Mineral Resources · Status: effective

Get this as JSONEmbed this
Cite this
Citation
30 CFR 57.6407, § 57.6407 Circuit testing, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/132809
Permanent ID
ys:prov:132809@1
SHA-256
d5d24e9840610fb550158f7f5b5bee72b180664b26a9ede9f0c094f2798a6c42

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

A blasting galvanometer or other instrument designed for testing blasting circuits shall be used to test the following: (a) In surface operations— (1) Continuity of each electric detonator in the blasthole prior to stemming and connection to the blasting line; (2) Resistance of individual series or the resistance of multiple balanced series to be connected in parallel prior to their connection to the blasting line; (3) Continuity of blasting lines prior to the connection of electric or electronic detonator series; and (4) Total blasting circuit resistance prior to connection to the power source. (b) In underground operations— (1) Continuity of each electric detonator series; and (2) Continuity of blasting lines prior to the connection of electric or electronic detonators.