§ 57.22304 Approved equipment (II-A mines).
United States · 30 CFR — Mineral Resources · Status: effective
Cite this
- Citation
- 30 CFR 57.22304, § 57.22304 Approved equipment (II-A mines), United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/133271
- Permanent ID
ys:prov:133271@1- SHA-256
b7902075d91ce648bb5a4ce4619892dfaa306285fb6de983d205c7e12fe8b7eb
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) Cutting and drilling equipment used at a face or bench shall be approved by MSHA under the applicable requirements of 30 CFR parts 18 through 36.
(b) While cutting or drilling is in progress, equipment not approved by MSHA under the applicable requirements of 30 CFR parts 18 through 36 shall remain at least 100 feet from the face or bench being mined.
(c) Tests for methane shall be conducted immediately before nonapproved equipment is taken to a face or bench after blasting.
(d) Mine power transformers and stationary equipment not approved by MSHA under the applicable requirements of 30 CFR parts 18 through 36 shall be installed in fresh air or downwind from an atmospheric methane monitor sensor.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.