30 CFR 250.192
§ 250.192 What reports and statistics must I submit relating to a hurricane, earthquake, or other natural occurrence?
United States · 30 CFR — Mineral Resources · Status: effective
Cite this
- Citation
- 30 CFR 250.192, § 250.192 What reports and statistics must I submit relating to a hurricane, earthquake, or other natural occurrence?, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/134435
- Permanent ID
ys:prov:134435@1- SHA-256
4d36fb8d6e6add0ee2cee91570b7db92e593af01f1db91dbd6e63c09f274eaac
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) You must submit evacuation statistics to the Regional Supervisor for a natural occurrence, such as a hurricane, a tropical storm, or an earthquake. Statistics include facilities and rigs evacuated and the amount of production shut-in for gas and oil. You must:
(1) Submit the statistics by fax or email (for activities in the BSEE GOA-OCS Region, use Form BSEE-0132) as soon as possible when evacuation occurs. In lieu of submitting your statistics by fax or email, you may submit them electronically in accordance with 30 CFR 250.186(a)(3);
(2) Submit the statistics on a daily basis by 11 a.m., as conditions allow, during the period of shut-in and evacuation;
(3) Inform BSEE when you resume production; and
(4) Submit the statistics either by BSEE district, or the total figures for your operations in a BSEE region.
(b) If your facility, production equipment, or pipeline is damaged by a natural occurrence, you must:
(1) Submit an initial damage report to the Regional Supervisor within 48 hours after you complete your initial evaluation of the damage. You must use Form BSEE-0143, Facility/Equipment Damage Report, to make this and all subsequent reports. In lieu of submitting Form BSEE-0143 by fax or e-mail, you may submit the damage report electronically in accordance with 30 CFR 250.186(a)(3). In the report, you must:
(i) Name the items damaged (e.g., platform or other structure, production equipment, pipeline);
(ii) Describe the damage and assess the extent of the damage (major, medium, minor); and
(iii) Estimate the time it will take to replace or repair each damaged structure and piece of equipment and return it to service. The initial estimate need not be provided on the form until availability of hardware and repair capability has been established (not to exceed 30 days from your initial report).
(2) Submit subsequent reports monthly and immediately whenever information submitted in previous reports changes until the damaged structure or equipment is returned to service. In the final report, you must provide the date the item was returned to service.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.