30 CFR 250.238
§ 250.238 What well or completions information must my DWOP include?
United States · 30 CFR — Mineral Resources · Status: effective
Cite this
- Citation
- 30 CFR 250.238, § 250.238 What well or completions information must my DWOP include?, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/134473
- Permanent ID
ys:prov:134473@1- SHA-256
23fc6cdb4b6c77b0e7366f1af765d9af8367f826dac133ceb1c116ee3ec8ec86
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
You must include the following information in your DWOP, as applicable, to be consistent with the activities to be addressed in the associated well permit(s):
(a) A description and schematic of the typical wellbore, casing, and completion;
(b) Information concerning the drilling and completion systems; and
(c) Design and fabrication information for each wellbore riser system (e.g., drilling, completion, workover, intervention, injection, or production) deployed from a floating production facility or TLP.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.