yourstate.us
30 CFR 250.240

§ 250.240 What production safety system information must my DWOP include?

United States · 30 CFR — Mineral Resources · Status: effective

Get this as JSONEmbed this
Cite this
Citation
30 CFR 250.240, § 250.240 What production safety system information must my DWOP include?, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/134475
Permanent ID
ys:prov:134475@1
SHA-256
3b17392aaba3f8a0a03a072b55ae79fdb66a62ac513a21f2a7b1bfe1e6e11b8c

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

You must include the following information in your DWOP, as applicable, to be consistent with the activities you plan to address in the associated production safety system application: (a) A general description of the operating procedures; (b) Information about the design, fabrication, and operation of an offtake system for transferring produced hydrocarbons to a transport vessel, including a table summarizing the curtailment of production and offloading based on operational considerations; (c) A description of the process facility installation and commissioning procedure; (d) A safety analysis flow diagram of the production system from the SCSSV downstream to the first item of separation equipment; (e) A statement that the surface and/or subsea safety system and emergency support systems will comply with Subpart H of this part. This statement must include: (1) The methods, frequency, and acceptance criteria for testing the underwater safety valves (USVs), SCSSVs, and boarding shutdown valves; (2) A description of the function and testing of the host facility Emergency Shutdown Device (ESD) system and its interface to the subsea system; and (3) If applicable, a description of the surface and/or subsea safety system and emergency support systems not covered in Subpart H of this part. If you propose to use systems not covered in Subpart H of this part, you must request an approval of alternate procedures or equipment according to § 250.141, and you must also include a table that depicts what valves will close, at what times, and for what events or reasons; and (f) Information regarding the design, operation, maintenance, personnel competency, and testing of your subsea leak detection system to protect your subsea field/infrastructure (e.g., trees, manifolds, jumpers). You must include a description of the procedures regarding how you will operate the system, ensure system functionality, identify a leak, and the actions you will take if a leak is identified.