yourstate.us
30 CFR 250.416

§ 250.416 What must I include in the diverter description?

United States · 30 CFR — Mineral Resources · Status: effective

Get this as JSONEmbed this
Cite this
Citation
30 CFR 250.416, § 250.416 What must I include in the diverter description?, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/134501
Permanent ID
ys:prov:134501@1
SHA-256
b9b4d46f9347f257ecd5107e23225cb523464343d4782f596b02011ca1e44804

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

You must include in the diverter description: (a) A description of the diverter system and its operating procedures; (b) A schematic drawing of the diverter system (plan and elevation views) that shows: (1) The size of the element installed in the diverter housing; (2) Spool outlet internal diameter(s); (3) Diverter-line lengths and diameters; burst strengths and radius of curvature at each turn; and (4) Valve type, size, working pressure rating, and location.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.