30 CFR 250.735
§ 250.735 What associated systems and related equipment must all BOP systems include?
United States · 30 CFR — Mineral Resources · Status: effective
Cite this
- Citation
- 30 CFR 250.735, § 250.735 What associated systems and related equipment must all BOP systems include?, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/134601
- Permanent ID
ys:prov:134601@1- SHA-256
b3a381e7ee69eede2cd59afed06185c595b4b6f9efd4dcb3d7b95728ab722640
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
All BOP systems must include the following associated systems and related equipment:
(a) An accumulator system (as specified in API Standard 53, incorporated by reference in § 250.198). Your accumulator system must have the fluid volume capacity and appropriate pre-charge pressures in accordance with API Standard 53. If you supply the accumulator regulators by rig air and do not have a secondary source of pneumatic supply, you must equip the regulators with manual overrides or other devices to ensure capability of hydraulic operations if rig air is lost;
(b) An automatic backup to the primary accumulator-charging system. The power source must be independent from the power source for the primary accumulator-charging system. The independent power source must possess sufficient capability to close and hold closed all BOP components under MASP conditions as defined for the operation;
(c) At least two full BOP control stations. One station must be on the rig floor. You must locate the other station in a readily accessible location away from the rig floor;
(d) The choke line(s) installed above the bottom well-control ram;
(e) The kill line must be installed beneath at least one well-control ram, and may be installed below the bottom ram;
(f) A fill-up line above the uppermost BOP;
(g) Locking devices for all BOP sealing rams (i.e., blind shear rams, pipe rams and variable bore rams), as follows:
(1) For subsea BOPs, hydraulic locking devices must be installed on all sealing rams;
(2) For surface BOPs:
(i) Remotely-operated locking devices must be installed on blind shear rams no later than April 29, 2019;
(ii) Manual or remotely-operated locking devices must be installed on pipe rams and variable bore rams; and
(h) A wellhead assembly with a RWP that exceeds the maximum anticipated wellhead pressure.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.