30 CFR 250.831
§ 250.831 Alteration or disconnection of subsea pipeline or umbilical.
United States · 30 CFR — Mineral Resources · Status: effective
Cite this
- Citation
- 30 CFR 250.831, § 250.831 Alteration or disconnection of subsea pipeline or umbilical, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/134643
- Permanent ID
ys:prov:134643@1- SHA-256
92e759b0bb26714f2bbbd2d8791a53de77f4ea0d74d61f39f33edc63516f7bed
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
If a necessary alteration or disconnection of the pipeline or umbilical of any subsea well would affect your ability to monitor casing pressure or to test any subsea valves or equipment, you must contact the appropriate District Office at least 48 hours in advance and submit a repair or replacement plan to conduct the required monitoring and testing. You must not alter or disconnect until the repair or replacement plan is approved.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.