yourstate.us
30 CFR 250.873

§ 250.873 Subsea gas lift requirements.

United States · 30 CFR — Mineral Resources · Status: effective

Get this as JSONEmbed this
Cite this
Citation
30 CFR 250.873, § 250.873 Subsea gas lift requirements, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/134679
Permanent ID
ys:prov:134679@1
SHA-256
f1926c5559b8eaa3b10070700d6e8e55c2e40b294df30f23904eaf1099152342

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

If you choose to install a subsea gas lift system, you must design your system as approved in your DWOP or as follows: (a) Design the gas lift supply pipeline in accordance with API RP 14C (incorporated by reference as specified in § 250.198) for the gas lift supply system located on the platform. (b) Meet the applicable requirements in the following table: (c) Follow the valve closure times and hydraulic bleed requirements according to your approved DWOP for the following: (1) Electro-hydraulic control system with gas lift, (2) Electro-hydraulic control system with gas lift with loss of communications, (3) Direct-hydraulic control system with gas lift. (d) Follow the gas lift system valve testing requirements according to the following table: