§ 550.1153 When must I conduct a static bottomhole pressure survey?

United States · 30 CFR — Mineral Resources · Status: effective

Get this as JSONEmbed this
Cite this
Citation
30 CFR 550.1153, § 550.1153 When must I conduct a static bottomhole pressure survey?, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/135341
Permanent ID
ys:prov:135341@1
SHA-256
9e8d3390ddba5f883c5a440d92cee1a48d42049df789d15d16f2e5e01ebe93b5

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) You must conduct a static bottomhole pressure survey under the following conditions: (b) Your bottomhole pressure survey must meet the following requirements: (1) You must shut-in the well for a minimum period of 4 hours to ensure stabilized conditions; and (2) The bottomhole pressure survey must consist of a pressure measurement at mid-perforation, and pressure measurements and gradient information for at least four gradient stops coming out of the hole. (c) You must submit to the Regional Supervisor the results of all static bottomhole pressure surveys on Form BOEM-140, Bottomhole Pressure Survey Report, within 60 days after the date of the survey. (d) The Regional Supervisor may grant a departure from the requirement to run a static bottomhole pressure survey. To request a departure, you must submit a justification, along with Form BOEM-0140, Bottomhole Pressure Survey Report, showing a calculated bottomhole pressure or any measured data.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.