yourstate.us
30 CFR 817.111

§ 817.111 Revegetation: General requirements.

United States · 30 CFR — Mineral Resources · Status: effective

Get this as JSONEmbed this
Cite this
Citation
30 CFR 817.111, § 817.111 Revegetation: General requirements, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/136643
Permanent ID
ys:prov:136643@1
SHA-256
13ae7095afd6841a2b97886809eb50b9b94c6b9b5e30f43a3112c23096065c57

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) The permittee shall establish on regraded areas and on all other disturbed areas except water areas and surface areas of roads that are approved as part of the postmining land use, as vegetative cover that is in accordance with the approved permit and reclamation plan and that is— (1) Diverse, effective, and permanent; (2) Comprised of species native to the area, or of introduced species where desirable and necessary to achieve the approved postmining land use and approved by the regulatory authority; (3) At least equal in extent of cover to the natural vegetation of the area; and (4) Capable of stabilizing the soil surface from erosion. (b) The reestablished plant species shall— (1) Be compatible with the approved postmining land use; (2) Have the same seasonal characteristics of growth as the original vegetation; (3) Be capable of self-regeneration and plant succession; (4) Be compatible with the plant and animal species of the area; and (5) Meet the requirements of applicable State and Federal seed, poisonous and noxious plant, and introduced species laws or regulations. (c) The regulatory authority may grant exception to the requirements of paragraphs (b) (2) and (3) of this section when the species are necessary to achieve a quick-growing, temporary, stabilizing cover, and measures to establish permanent vegetation are included in the approved permit and reclamation plan. (d) When the regulatory authority approves a cropland postmining land use, the regulatory authority may grant exceptions to the requirements of paragraphs (a) (1), (3), (b) (2), and (3) of this section. The requirements of part 823 of this chapter apply to areas identified as prime farmland.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.