yourstate.us
33 CFR 117.9

§ 117.9 Delaying opening of a draw.

United States · 33 CFR — Navigation and Navigable Waters · Status: effective

Get this as JSONEmbed this
Cite this
Citation
33 CFR 117.9, § 117.9 Delaying opening of a draw, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/150623
Permanent ID
ys:prov:150623@1
SHA-256
ea9146265a6383931cd3de8b027dac244b85319b31f569b905e53cd8d346c7f0

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

No person shall unreasonably delay the opening of a draw after the signals required by § 117.15 have been given. Trains are usually controlled by the block method. That is, the track is divided into blocks or segments of a mile or more in length. When a train is in a block with a drawbridge, the draw may not be able to open until the train has passed out of the block and the yardmaster or other manager has “unlocked” the drawbridge controls. The maximum time permitted for delay is defined in Subpart B for each affected bridge. Land and water traffic should pass over or through the draw as soon as possible in order to prevent unnecessary delays in the opening and closure of the draw.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.