yourstate.us
33 CFR 117.139

§ 117.139 White River.

United States · 33 CFR — Navigation and Navigable Waters · Status: effective

Get this as JSONEmbed this
Cite this
Citation
33 CFR 117.139, § 117.139 White River, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/150660
Permanent ID
ys:prov:150660@1
SHA-256
dc4f07098a54be8f1b8e074c757499c04e1bd39fdb272b0669520e7062e076a1

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

The draws of the St. Louis Southwestern railroad bridge, mile 98.9 at Clarendon, the Missouri Pacific railroad bridge, mile 196.3 at Augusta and the Missouri Pacific railroad bridge, mile 254.8 at Newport, shall open on signal if at least eight hours' notice is given. The draws of any of these bridges need not be opened for a vessel that arrives later than two hours after the time specified in the notice, unless a second notice of at least eight hours is given.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.