33 CFR 117.191
§ 117.191 San Joaquin River.
United States · 33 CFR — Navigation and Navigable Waters · Status: effective
Cite this
- Citation
- 33 CFR 117.191, § 117.191 San Joaquin River, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/150688
- Permanent ID
ys:prov:150688@1- SHA-256
78faa530e8de22dd14f07577907f6813f083ef3617adbe0f30de3b8a49d9f482
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) The draw of the Port of Stockton railroad bridge, mile 39.7 at Stockton, shall open on signal if at least 12 hours notice is given to the Port Director.
(b) The draws of the U.S. Navy Draw-bridge, mile 39.8, Burlington Northern Santa Fe railroad bridge, mile 40.6, and California Highway 4 bridge (Garwood Bridge), mile 41.6, need not be opened for the passage of vessels. The owners or agencies controlling the bridges shall restore the draws to full operation within six months of notification to take such action from the District Commander.
(c) Drawbridges above the Old River junction need not open for the passage of vessels.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.