33 CFR 117.211
§ 117.211 Mystic River.
United States · 33 CFR — Navigation and Navigable Waters · Status: effective
Cite this
- Citation
- 33 CFR 117.211, § 117.211 Mystic River, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/150698
- Permanent ID
ys:prov:150698@1- SHA-256
ca6420e3e881e83068560b84bc484b2a8dd4deed91da156bba59228c103d137f
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) The draw of the Amtrak railroad bridge, mile 2.4 at Mystic, shall operate as follows:
(1) From April 1 to October 31, the draw shall open on signal.
(2) From November 1 to March 31, the draw shall open on signal from 5 a.m. to 9 p.m. From 9 p.m. to 5 a.m., the draw shall open on signal if at least eight hours notice is given.
(3) Commercial vessels shall be passed immediately at any time; however, the opening may be delayed up to eight minutes to allow trains, which have entered the drawbridge block and are scheduled to cross the bridge without stopping, to clear the block.
(4) All other vessels shall be passed as soon as practicable but no later than 20 minutes after the signal to open is given.
(b) The draw of the U.S. 1 Bridge, mile 2.8, at Mystic, shall open on signal except:
(1) From May 1 through October 31, from 7:40 a.m. to 6:40 p.m., the draw need only open hourly at twenty minutes before the hour.
(2) From November 1 through April 30, from 8 p.m. to 4 a.m., the draw shall open on signal if at least six-hours notice is given by calling the number posted at the bridge.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.