33 CFR 117.351
§ 117.351 Altamaha River.
United States · 33 CFR — Navigation and Navigable Waters · Status: effective
Cite this
- Citation
- 33 CFR 117.351, § 117.351 Altamaha River, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/150754
- Permanent ID
ys:prov:150754@1- SHA-256
de479c17c58a6ec8af2970e436eeda3bab4b3cb9b6cfd111a7d2168a42431acb
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) The draws of all bridges, except the Seaboard System Railroad bridge, mile 59.4 at Doctortown, shall open on signal if at least 24 hours notice is given.
(b) The draw of the Seaboard System Railroad bridge, mile 59.4 at Doctortown, shall open on signal if at least seven days notice is given.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.