33 CFR 117.401
§ 117.401 Trail Creek.
United States · 33 CFR — Navigation and Navigable Waters · Status: effective
Cite this
- Citation
- 33 CFR 117.401, § 117.401 Trail Creek, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/150767
- Permanent ID
ys:prov:150767@1- SHA-256
f589fcd388c2524e7aba6ee9dfda0fad22477274065aa29f4340e1bd9bfcd293
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) The draw of the Franklin Street bridge, mile 0.5 at Michigan City, shall be operated as follows:
(1) From March 16 through November 30, the draw shall open on signal; except from 6:15 a.m. to 11:15 p.m., Monday through Sunday, the draw need open only from three minutes before to three minutes after the quarter-hour and three-quarter hour.
(2) From December 1 through March 15, the draw shall open on signal if at least 12-hours advance notice is provided prior to intended time of passage.
(b) The draw of the Amtrak Railroad Bridge, mile 0.9, at Michigan City shall open on signal, except from December 1 through March 15 the draw shall open if at least 12-hours advance notice is given. The bridge is authorized to be operated remotely. The bridge shall operate and maintain a VHF-FM Marine Radio.
(c) Public vessels of the United States, state or local vessels used for public safety, vessels in distress, and vessels seeking shelter from severe weather shall be passed through the draws of each bridge as soon as possible.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.