33 CFR 117.460
§ 117.460 La Carpe Bayou.
United States · 33 CFR — Navigation and Navigable Waters · Status: effective
Cite this
- Citation
- 33 CFR 117.460, § 117.460 La Carpe Bayou, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/150796
- Permanent ID
ys:prov:150796@1- SHA-256
d6c5fbcdf0486f0bc0fe5b986133fb28b60a3aaf8ab5a73bb412bf17e9e2a31b
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
The draw of the S661 bridge, mile 7.5, shall open on signal if at least four hours advance notice is given; except that, the draw need not be opened for the passage of vessels Monday through Friday except holidays from 7 a.m. to 8:30 a.m. and 4:30 p.m. to 6 p.m.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.