yourstate.us
33 CFR 117.481

§ 117.481 Milhomme Bayou.

United States · 33 CFR — Navigation and Navigable Waters · Status: effective

Get this as JSONEmbed this
Cite this
Citation
33 CFR 117.481, § 117.481 Milhomme Bayou, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/150806
Permanent ID
ys:prov:150806@1
SHA-256
4312b8acc6256db9ba7cbefe5d430c9f00940c93d0041a68ac65c220b8102e5d

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

The draw of the Stephensville Bridge, mile 12.2 (Landside Route) at Stephensville shall open on signal if at least one hour of advance notice is given. During the advance notice period, the draw shall open on less than one hour notice for an emergency, and shall open on demand should a temporary surge in waterway traffic occur.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.