33 CFR 117.487
§ 117.487 Pierre Pass.
United States · 33 CFR — Navigation and Navigable Waters · Status: effective
Cite this
- Citation
- 33 CFR 117.487, § 117.487 Pierre Pass, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/150809
- Permanent ID
ys:prov:150809@1- SHA-256
408c05cdc2257018396b8247f4a321dd7e75dbb71c2b859b6f3fac7c1c7621f2
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
The draw of the S70 bridge, mile 1.0 at Pierre Part, shall open on signal; except that, from 10 p.m. to 6 a.m., the draw shall open on signal if at least four hours notice is given. During the advance notice period, the draw shall open on less than four hours notice for an emergency and shall open on demand should a temporary surge in waterway traffic occur.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.