33 CFR 117.603
§ 117.603 Manchester Harbor.
United States · 33 CFR — Navigation and Navigable Waters · Status: effective
Cite this
- Citation
- 33 CFR 117.603, § 117.603 Manchester Harbor, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/150858
- Permanent ID
ys:prov:150858@1- SHA-256
578d88ee9256e2ab7245e1c396d37412918149eee966f222b4d89b1546747b18
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
The Massachusetts Bay Transportation Authority Bridge at mile 1.0 in Manchester, shall operate as follows:
(a) The draw shall open on signal—
(1) From Memorial Day through September 30 from 7 a.m. to 11 p.m.;
(2) From April 1 to Memorial Day and from October 1 to November 1 from 9 a.m. to 1 p.m. and 2 p.m. to 6 p.m.
(b) At all other times, the draw shall open on signal with at least four hours notice.
(c) The owner of this bridge shall provide and keep in good legible condition, clearance gauges for each draw with figures not less than twelve (12) inches high designed, installed and maintained in accordance with the provisions of section 118.160 of this chapter.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.