33 CFR 117.620
§ 117.620 Westport River—East Branch.
United States · 33 CFR — Navigation and Navigable Waters · Status: effective
Cite this
- Citation
- 33 CFR 117.620, § 117.620 Westport River—East Branch, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/150866
- Permanent ID
ys:prov:150866@1- SHA-256
f5e872965e377d7c9055c9980435be675243aba20b20a4be189cafcff5e899e2
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
The Westport Point Bridge, mile 1.2 at Westport, shall operate as follows:
(a) Public vessels of the United States must be passed as soon as possible.
(b) The owners of this bridge shall provide and keep in good legible condition clearance gauges for each draw with figures not less than 12 inches high designed, installed, and maintained, according to the provisions of § 118.160 of this chapter.
(c) That the drawspan for the Westport Point Drawbridge, mile 1.2 at Westport, must open on signal if at least 24 hours notice is given.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.