33 CFR 117.643
§ 117.643 Pine River (St. Clair).
United States · 33 CFR — Navigation and Navigable Waters · Status: effective
Cite this
- Citation
- 33 CFR 117.643, § 117.643 Pine River (St. Clair), United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/150877
- Permanent ID
ys:prov:150877@1- SHA-256
ecd8f1a91c806719d58093ea48da30eb4f4e95e1c8869a86a60b5fb318c82976
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
The draw of the S29 bridge, mile 0.1 at St. Clair, shall open on signal from April 1 through November 30 from 2 a.m. to 8 a.m. and from 8 a.m. to 2 a.m. on the hour and one-half hour. From December 1 through March 31, the draw shall open on signal if at least 24 hours notice is given. Public vessels of the United States, state or local vessels used for public safety, and vessels in distress shall be passed through the draw as soon as possible.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.