33 CFR 117.667
§ 117.667 St. Croix River.
United States · 33 CFR — Navigation and Navigable Waters · Status: effective
Cite this
- Citation
- 33 CFR 117.667, § 117.667 St. Croix River, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/150886
- Permanent ID
ys:prov:150886@1- SHA-256
ce44ed29107efdd5b01aa45fd76b144706c461617c7d90454a41c850a41546f2
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) The draws of the Burlington Northern Santa Fe Railroad Bridge, Mile 0.2, the Prescott Highway Bridge, Mile 0.3, and the Hudson Railroad Bridge, Mile 17.3, shall operate as follows:
(1) From April 1 to October 31:
(i) 8 a.m. to midnight, the draws shall open on signal;
(ii) Midnight to 8 a.m., the draws shall open on signal if notification is made prior to 11 p.m.,
(2) From November 1 through March 31, the draw shall open on signal if at least 24 hours notice is given.
(b) The draw of the Stillwater Lift Bridge, Mile 23.4, shall open on signal as follows:
(1) From May 15 through October 15, daily:
(i) 8 a.m. to midnight, every half hour;
(ii) Midnight to 8 a.m., upon two hours notice.
(2) From October 16 through May 14, if at least 24 hours notice is given.
(c) The draw of the Soo Line Railroad Bridge, Mile 40.7, at Otisville, need not be opened for the passage of vessels.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.