yourstate.us
33 CFR 117.687

§ 117.687 Missouri River.

United States · 33 CFR — Navigation and Navigable Waters · Status: effective

Get this as JSONEmbed this
Cite this
Citation
33 CFR 117.687, § 117.687 Missouri River, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/150895
Permanent ID
ys:prov:150895@1
SHA-256
f8ac0e45ee34756a46a9eb5fddc7e7ed6db778596b80e929a4f052619273ad09

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

The draws of the bridges, except for the Atchison Railroad Bridge, Mile 422.5, see § 117.411(b) for further details, across the Missouri River shall open on signal; except during the winter season between the date of closure and date of opening of the commercial navigation season as published by the Army Corps of Engineers, the draws need not open unless at least 24-hours advance notice is given.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.