yourstate.us
33 CFR 117.705

§ 117.705 Beaver Dam Creek.

United States · 33 CFR — Navigation and Navigable Waters · Status: effective

Get this as JSONEmbed this
Cite this
Citation
33 CFR 117.705, § 117.705 Beaver Dam Creek, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/150902
Permanent ID
ys:prov:150902@1
SHA-256
3106b7b3f76886ff4d0e24e1a13159490d30bb9fd2362b921b4e84934b2520b5

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

The draw of the Ocean County bridge, mile 0.5 at Point Pleasant, shall open on signal from June 1 through September 30 and from 8 a.m. to 4 p.m. during April, May, October, and November. At all other times, the draw shall open on signal if at least 24 hours notice is given.