Wash. Rev. Code § 39.35.040

Facility design to include life-cycle cost analysis

Washington · Revised Code of Washington Chapter 39.35 — Energy Conservation in Design of Public Facilities · Status: effective

Get this as JSONEmbed this
Cite this
Citation
Wash. Rev. Code § 39.35.040, Facility design to include life-cycle cost analysis, Washington, version 1 as recorded 2026-09-28, yourstate.us, https://yourstate.us/provision/1509366
Permanent ID
ys:prov:1509366@1
SHA-256
6e21b4f2eba8b5d01fbc722c96908979cd9f4d72c6b2b998b64bbc46f2a086d1

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

Whenever a public agency determines that any major facility or a critical governmental facility is to be constructed or renovated, such agency shall cause to be included in the design phase of such construction or renovation a provision that requires a life-cycle cost analysis conforming with the guidelines developed in RCW 39.35.050 to be prepared for such facility. Such analysis shall be approved by the agency prior to the commencement of actual construction or renovation. A public agency may accept the facility design if the agency is satisfied that the life-cycle cost analysis provides for an efficient energy system or systems based on the economic life of the facility.Nothing in this section prohibits the construction or renovation of major facilities or critical governmental facilities that utilize renewable energy or combined heat and power systems.