33 CFR 117.955

§ 117.955 Buffalo Bayou.

United States · 33 CFR — Navigation and Navigable Waters · Status: effective

Get this as JSONEmbed this
Cite this
Citation
33 CFR 117.955, § 117.955 Buffalo Bayou, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/150995
Permanent ID
ys:prov:150995@1
SHA-256
464cb2ba048c4c3a225a4bb8304fe517a42644c95f3d2aae4e0a97be2b3bb9b2

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

The draw of the Houston Belt and Terminal railroad bridge, mile 1.2 at Houston, and all drawbridges downstream of it, shall open on signal if at least 24 hours' notice if given.