§ 117.965 Cow Bayou.
United States · 33 CFR — Navigation and Navigable Waters · Status: effective
Cite this
- Citation
- 33 CFR 117.965, § 117.965 Cow Bayou, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/150997
- Permanent ID
ys:prov:150997@1- SHA-256
926da05a382bac4bbdd432167774af8cd6bfa5023abea3646c3251a0cae6fbff
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
The draws of the Orange County highway bridge, mile 2.9 at West Orange, and the S87 bridge, mile 4.5 at Bridge City, shall open on signal if at least six hours notice is given.