33 CFR 154.110

§ 154.110 Letter of intent.

United States · 33 CFR — Navigation and Navigable Waters · Status: effective

Get this as JSONEmbed this
Cite this
Citation
33 CFR 154.110, § 154.110 Letter of intent, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/151986
Permanent ID
ys:prov:151986@1
SHA-256
3c09352128f15e9628de9d4352ef55af8dd40e7c83284d67b151f4bee69de4b1

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) The facility operator of any facility to which this part applies must submit a letter of intent to operate a facility or to conduct mobile facility operations to the COTP not less than 60 days before the intended operations unless a shorter period is allowed by the COTP. Previously submitted letters of intent need not be resubmitted. (b) The letter of intent required by paragraph (a) of this section may be in any form but must contain: (1) The names, addresses, and telephone numbers of the facility operator and the facility owner; (2) The name, address, and telephone number of the facility or, in the case of a mobile facility, the dispatching office; and (3) Except for a mobile facility, the geographical location of the facility in relation to the associated body of navigable waters. (c) The facility operator of any facility for which a letter of intent has been submitted, shall within five (5) days advise the COTP in writing of any changes of information and shall cancel, in writing, the letter for any facility at which transfer operations are no longer conducted.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.