yourstate.us
33 CFR 155.1130

§ 155.1130 Requirements for prepositioned response equipment.

United States · 33 CFR — Navigation and Navigable Waters · Status: effective

Get this as JSONEmbed this
Cite this
Citation
33 CFR 155.1130, § 155.1130 Requirements for prepositioned response equipment, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/152171
Permanent ID
ys:prov:152171@1
SHA-256
e91aae86baa4982bf52abcf37db5d3c0e9bebf61e3474e845554fd2b450230f6

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

The owner or operator of a tanker subject to this subpart shall provide the following prepositioned response equipment, located within Prince William Sound, in addition to that required by § 155.1035: (a) On-water recovery equipment with a minimum effective daily recovery capacity of 30,000 barrels, capable of being on scene within 6 hours of notification of a discharge. (b) On-water storage capacity of 100,000 barrels, capable of being on scene within 6 hours of notification of a discharge. (c) Additional on-water recovery equipment with a minimum effective daily recovery capacity of 40,000 barrels capable of being on scene within 18 hours of notification of a discharge. (d) On-water storage capacity of 300,000 barrels for recovered oily material, capable of being on scene within 24 hours of notification of a discharge. (e) On-water oil recovery devices and storage equipment located in communities and at strategic locations. (f) For sufficient protection of the environment in the locations identified in § 155.1125(a)(1)(ii)— (1) Boom appropriate for the specific locations; (2) Sufficient boats to deploy boom and sorbents; (3) Sorbents including booms, sweeps, pads, blankets, drums and plastic bags; (4) Personnel protective clothing and equipment; (5) Survival equipment; (6) First aid supplies; (7) Buckets, shovels, and various other tools; (8) Decontamination equipment; (9) Shoreline cleanup equipment; (10) Mooring equipment; (11) Anchored buoys at appropriate locations to facilitate the positioning of defensive boom; and (12) Other appropriate removal equipment for the protection of the environment as identified by the COTP. (g) For each oil-laden tanker, an escorting response vessel which is fitted with skimming and on board storage capabilities practicable for the initial oil recovery planned for a cleanup operation, as identified by the oil spill removal organization. (h) Lightering resources required in subpart I of this part capable of arriving on scene within 6 hours of notification of a discharge.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.