Wash. Rev. Code § 65.08.170
Notice of additional water or sewer facility tap or connection charges—Required—Contents
Washington · Revised Code of Washington Chapter 65.08 — Recording · Status: effective
Cite this
- Citation
- Wash. Rev. Code § 65.08.170, Notice of additional water or sewer facility tap or connection charges—Required—Contents, Washington, version 1 as recorded 2026-09-28, yourstate.us, https://yourstate.us/provision/1525035
- Permanent ID
ys:prov:1525035@1- SHA-256
7d3e1a8814d6fa283c6bbaf03a23f8cce0f0a011be181a6c40df07ca311067ad
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
When any municipality as defined in *RCW 35.91.020 or any county has levied or intends to levy a charge on property pertaining to:
(1) The amount required by the provisions of a contract pursuant to RCW 35.91.020 under which the water or sewer facilities so tapped into or used were constructed; or(2) Any connection charges which are in fact reimbursement for the cost of facilities constructed by the sale of revenue bonds; or(3) The additional connection charge authorized in RCW 35.92.025;such municipality or county shall record in the office in which deeds are recorded of the county or counties in which such facility is located a notice of additional tap or connection charges. Such notice shall contain either the legal description of the land affected by such additional tap or connection charges or a map making appropriate references to the United States government survey showing in outline the land affected or to be affected by such additional tap or connection charges.