Wash. Rev. Code § 79.110.210
Right-of-way for utility pipelines, transmission lines, etc.—Procedure to acquire
Washington · Revised Code of Washington Chapter 79.110 — Aquatic Lands—Easements and Rights-of-Way · Status: effective
Cite this
- Citation
- Wash. Rev. Code § 79.110.210, Right-of-way for utility pipelines, transmission lines, etc.—Procedure to acquire, Washington, version 1 as recorded 2026-09-28, yourstate.us, https://yourstate.us/provision/1532880
- Permanent ID
ys:prov:1532880@1- SHA-256
67e2f639a22e320970f8e9cb5843a7c9dd87ac2c54d74ae7d5253c04526650f4
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
In order to obtain the benefits of the grant made in RCW 79.110.200, the person or the United States of America constructing or proposing to construct, or which has constructed, a telephone line, ditch, flume, pipeline, or transmission line, shall file, with the department, a map accompanied by the field notes of the survey and location of the telephone line, ditch, flume, pipeline, or transmission line, and shall make payment as provided in RCW 79.110.220. The land within the right-of-way shall be limited to an amount necessary for the construction of the telephone line, ditch, flume, pipeline, or transmission line sufficient for the purposes required, together with sufficient land on either side thereof for ingress and egress to maintain and repair the telephone line, ditch, flume, pipeline, or transmission line. The grant shall also include the right to cut all standing timber outside the right-of-way marked as danger trees located on public lands upon full payment of the appraised value.