Wash. Rev. Code § 90.48.480
Reduction of sewer overflows—Plans—Compliance schedule
Washington · Revised Code of Washington Chapter 90.48 — Water Pollution Control · Status: effective
Cite this
- Citation
- Wash. Rev. Code § 90.48.480, Reduction of sewer overflows—Plans—Compliance schedule, Washington, version 1 as recorded 2026-09-28, yourstate.us, https://yourstate.us/provision/1538245
- Permanent ID
ys:prov:1538245@1- SHA-256
c3d5a03700ae8a0c3f993ca3c25e840ad9bdd0e12e0d3f4c78967b76fb611961
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
The department of ecology shall work with local governments to develop reasonable plans and compliance schedules for the greatest reasonable reduction of combined sewer overflows. The plan shall address various options, including construction of storage tanks for sewage and separation of sewage and stormwater transport systems. The compliance schedule shall be designed to achieve the greatest reasonable reduction of combined sewer overflows at the earliest possible date. The plans and compliance schedules shall be completed by January 1, 1988. A compliance schedule will be a condition of any waste discharge permit issued or renewed after January 1, 1988.