§ 75.604 During the construction.

United States · 34 CFR — Education · Status: effective

Get this as JSONEmbed this
Cite this
Citation
34 CFR 75.604, § 75.604 During the construction, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/154657
Permanent ID
ys:prov:154657@1
SHA-256
2ab5620d80949d2f78458ce7b40c6189b1570de0cee7727364cef13ee968c9f6

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) A grantee must maintain competent architectural engineering supervision and inspection at the construction site to ensure that the work conforms to the approved final working specifications. (b) A grantee must complete the construction in accordance with the approved final working specifications unless a revision is approved. (c) If a revision to the timeline, budget, or approved final working specifications is required, the grantee must request prior written approval consistent with 2 CFR 200.308(h). (d) A grantee must comply with Federal laws regarding prevailing wages on construction and minor remodeling projects assisted with Department funding, including, as applicable, subchapter IV of chapter 31 of title 40, United States Code (commonly known as the “Davis-Bacon Act”; as applied through section 439 of GEPA; 20 U.S.C. 1232b) and any tribally determined prevailing wages. (e) A grantee must submit periodic performance reports regarding the construction project containing information specified by the Secretary consistent with 2 CFR 200.329(d).

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.