34 CFR 75.605
§ 75.605 After the construction.
United States · 34 CFR — Education · Status: effective
Cite this
- Citation
- 34 CFR 75.605, § 75.605 After the construction, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/154658
- Permanent ID
ys:prov:154658@1- SHA-256
a12e492470359266ffa9887c5faac3e92c11595ecf33ae85a5abcd7e345ad16b
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) A grantee must ensure that sufficient funds will be available for effective operation and maintenance of the facilities after the construction is complete.
(b) A grantee must operate and maintain the facilities in accordance with applicable Federal, State, and local requirements.
(c) A grantee must maintain all financial records, supporting documents, statistical records, and other non-Federal entity records pertinent to the construction project consistent with 2 CFR 200.334.