§ 9.171 Can I get an extension to the well plugging requirement?

United States · 36 CFR — Parks, Forests, and Public Property · Status: effective

Get this as JSONEmbed this
Cite this
Citation
36 CFR 9.171, § 9.171 Can I get an extension to the well plugging requirement?, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/158459
Permanent ID
ys:prov:158459@1
SHA-256
86f00cd07905c5f7de24eb6c02ff88f29bb1627d82de1b0b107b3e359f15f4df

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) You may apply for either a modification to your approved operations permit or, in the case of previously exempt operations, an operations permit to maintain your well in a shut-in status for up to 5 years. The application must include: (1) An explanation of why the well is shut-in or temporarily abandoned and your future plans for utilization; (2) Proof of the mechanical integrity of both surface and production casing demonstrating that no migration of fluid can be expected to occur; and (3) A description of the manner in which your well, equipment, and area of operations will be maintained. (b) Based on the information provided under this section, the Regional Director may approve your application to maintain your well in shut-in status for a period up to 5 years. You may apply for additional extensions by submitting a new application under paragraph (a) of this section.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.