7 CFR 58.123
§ 58.123 Survey and approval.
United States · 7 CFR — Agriculture · Status: effective
Cite this
- Citation
- 7 CFR 58.123, § 58.123 Survey and approval, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/16041
- Permanent ID
ys:prov:16041@1- SHA-256
4bdc45e5ece269594d7d2a4f0066c623672f879b38c7e2a05159e448f2acc8cf
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
Prior to the approval of a plant, a designated representative of the Administrator shall make a survey of the plant, premises, storage facilities, equipment and raw material, volume of raw material processed daily, and facilities for handling the products at the plant. The survey shall be made at least twice a year to determine whether the facilities, equipment, method of operation, and raw material being received are adequate and suitable for USDA inspection and grading service in accordance with the provisions of this part. To be eligible for approval a plant shall satisfactorily meet the specifications of this subpart as determined by the Administrator.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.