yourstate.us
7 CFR 58.214

§ 58.214 General construction, repair and installation.

United States · 7 CFR — Agriculture · Status: effective

Get this as JSONEmbed this
Cite this
Citation
7 CFR 58.214, § 58.214 General construction, repair and installation, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/16083
Permanent ID
ys:prov:16083@1
SHA-256
9625d54e5cf0dac2933706e664883b7fa7d15bbb5e3dc08a50385e0b4b4d4443

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

All equipment and utensils necessary to the manufacture of dry milk products, including pasteurizer, timing-pump or device, flow diversion valve and recorder controller, shall meet the same general requirements as outlined in § 58.128 of this subpart. In addition, for certain other equipment the following requirements shall be met.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.