yourstate.us
Ind. Code § 8-1-31-5

"Eligible infrastructure improvements"

Indiana · Indiana Code Title 8 — Utilities and Transportation · Status: effective

Get this as JSONEmbed this
Cite this
Citation
Ind. Code § 8-1-31-5, "Eligible infrastructure improvements", Indiana, version 1 as recorded 2026-09-28, yourstate.us, https://yourstate.us/provision/1617954
Permanent ID
ys:prov:1617954@1
SHA-256
015ac1a1ca40c3165b06571f2b0f055fa0a4b63de2c68ab6e9d2124b93d10622

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

Sec. 5. As used in this chapter, "eligible infrastructure improvements" means projects that: (1) are: (A) new water or wastewater utility distribution or collection plant projects; or (B) projects to relocate existing utility plant, including projects to relocate utility plant or equipment to accommodate the construction, reconstruction, or improvement of a highway, street, or road (as defined in IC 8-23-1.1-22), including projects under IC 8-25; (2) do not increase revenues by connecting to new customers, even if the projects provide greater available capacity with respect to an eligible utility's distribution or collection plant; and (3) either: (A) for a public utility: (i) are in service and used and useful; and (ii) were not included in the public utility's rate base in its most recent general rate case; or (B) for a municipally owned or not-for-profit utility: (i) are or will be extensions or replacements of projects described in subdivision (1), as described in section 5.5(2)(B) or 5.5(3)(B) of this chapter, as applicable; (ii) were not included on the utility's balance sheet as plant in service in the utility's most recent general rate case; and (iii) are not infrastructure improvements that are being recovered or have been recovered through rates or another rate adjustment mechanism.