Minn. Stat. § 115A.192
Request for Proposals; Stabilization and Containment Facility
Minnesota · Minnesota Statutes Chapter 115A — Waste Management · Status: effective
Cite this
- Citation
- Minn. Stat. § 115A.192, Request for Proposals; Stabilization and Containment Facility, Minnesota, version 1 as recorded 2026-09-28, yourstate.us, https://yourstate.us/provision/1703418
- Permanent ID
ys:prov:1703418@1- SHA-256
bfcc3d7652e7017ae58a6536ec97dd36e5e38f671565ad2032c41f3bfef73c11
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
Subdivision 1. Request for proposals.
The commissioner shall issue requests for proposals for the development and operation of a stabilization and containment facility. The request must be designed to obtain detailed information about the qualifications of a respondent to develop and operate the facility; the capital and operating costs of the facility and the sources and methods by which the respondent plans to finance the facility; the technical specifications of the proposed facility and the technologies to be employed for processing, stabilization, containment, and monitoring; the requirements of the site for the proposed facility; the schedule for developing and commencing operation of the facility; and other matters which the commissioner deems necessary for the agency to evaluate and select a developer and operator for the facility. Before issuing the requests, the commissioner shall prepare a draft of clauses (1) to (5) of the report required by section 115A.193, paragraph (a). The draft must accompany the requests for proposals.
Subd. 2. Selection of developer; procedure.
After evaluating responses to the request for proposals and before selecting a site as provided in section 115A.194, the agency shall decide whether to select a developer for a stabilization and containment facility. If the agency selects a developer it shall proceed as provided in section 115A.194 to select a site for the development of a facility. If the agency decides not to select a developer, the agency shall proceed as provided in section 115A.194 to select and acquire a site for potential future development of a facility.