40 CFR 60.383
§ 60.383 Reconstruction.
United States · 40 CFR — Protection of Environment · Status: effective
Cite this
- Citation
- 40 CFR 60.383, § 60.383 Reconstruction, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/171964
- Permanent ID
ys:prov:171964@1- SHA-256
af00113503b18c5771b287b150428ebb559985005c367a7a5dc3fda7a8a9501e
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) The cost of replacement of ore-contact surfaces on processing equipment shall not be considered in calculating either the “fixed capital cost of the new components” or the “fixed capital cost that would be required to construct a comparable new facility” under § 60.15. Ore-contact surfaces are: Crushing surfaces; screen meshes, bars, and plates; conveyor belts; elevator buckets; and pan feeders.
(b) Under § 60.15, the “fixed capital cost of the new components” includes the fixed capital cost of all depreciable components (except components specified in paragraph (a) of this section) that are or will be replaced pursuant to all continuous programs of component replacement commenced within any 2-year period following August 24, 1982.